Wednesday, June 22, 2016

On wards and Up




 The refilling of the lower hull continued along with building of the new crossbeams
After the beams the floor was laid. The only variation I made was to drop an area next to the galley. I'm 6'3" and the cross beam for the roof would catch me so lowering the floor will hopefully stop many future headaches.
Once the floor was finished the galley rebuild was started and the shower cubicle was re positioned. and the door reinstalled. The door was lifted 2" to make the cabin more secure from water, and also reduce the chances of head injuries :-) 
The rear engine cover was removed and a new seating area built to make the area usable as a secondary bunk



No comments:

Post a Comment